Project

Verdigris Water Treatment Plant – Pretreatment Basin Expansion

Verdigris Water Treatment Plant – Pretreatment Basin Expansion — Broken Arrow, OK
Verdigris Water Treatment Plant – Pretreatment Basin Expansion — Broken Arrow, OK
Verdigris Water Treatment Plant – Pretreatment Basin Expansion — Broken Arrow, OK
Verdigris Water Treatment Plant – Pretreatment Basin Expansion — Broken Arrow, OK

Project Description

This project consists of constructing a new pretreatment basin to expand the pretreatment capacity from 20 mgd to 30 mgd.  The pretreatment basin consists of rapid mixing, three-stage flocculation, and plate settlers with sludge collectors and pumps.  The project also includes construction of a raw water flow meter vault, a control valve vault, new chemical feed pumps and accessories in the existing Membrane Building, a new electrical building, electrical and instrumentation and control work for the new facilities, and associated site work and yard piping.

Caring for the environment through engineering and construction